<< return to blog entries
2010-09-15 13:09:53 (7150 views) Past two days (we're not just playing with colors):
- Bank account finally operable.
- Card processing moving forward.
- UK lab says no need to test indicator LEDs to laser safety standards
- Plastic and rubber pretty much sorted out
- Final verdict from the lab after the engineer did the TWO tests he had forgotten: we pass. FCC report coming soon
- Next: reconnect with the PCB assembly people. Produce final PCBs (white, gold plated). Try automatic assembly.
Comments
Post new comment
|