Blog top | Forums top | DreamLover Labs Main site | DL Lounge
Register | Login




Shop for male chastity devices and other training tools through this link to support us.


New stuff:

2025-02-02
Once again
by DreamLover Labs
2025-02-02
Search for battery welder...
by dreamloverlabs
2025-02-01
When I click on that link temu...
by treasure
2025-01-30
Email fixed once again
by DreamLover Labs
2025-01-19
Creating your own battery packs
by DreamLover Labs
2024-11-29
Converting the app
by DreamLover Labs
2023-12-01
Emails not received
by DreamLover Labs
2023-08-17
Can you shower or get the DL20...
by chastitydomme
2023-08-17
I would also like to hear from...
by jcoldstream
2023-08-17
Where can I find other people ...
by ahsdfjklhfw
2023-08-17
My husband needs to have a DL ...
by jcoldstream
2023-04-14
I love it...
by sissymaidemily
2022-11-05
Closed or opened Indication fo...
by switch95forfun
2022-10-05
Battery suppliers
by DreamLover Labs
2022-07-25
System appears to be stable
by DreamLover Labs
2022-07-23
Diagnosing network issues
by DreamLover Labs
2022-06-26
Connection issues? Download the updated Windows app
by DreamLover Labs
2022-06-24
Server down...
by Alex2012
2022-06-24
Please download the updated Wi...
by dreamloverlabs
2022-06-24
I have tried several times to ...
by nikki.smith
2022-06-24
Login Response Unsuccessful...
by SlaveofDesire86
2021-11-05
Mistress Keyholder Rules the W...
by mistresskeyholder
2021-10-22
Widget not working...
by slavejake
2021-09-03
Giving back the Temp Ownership...
by keyholder0734
2021-08-24
Hybrid solar systems...
by unipu2009
2021-08-24
What do you say guys shall we ...
by dreamloverlabs
2020-12-10
Battery passivation
by DreamLover Labs
2019-03-31
Hi, I am looking for a keyhold...
by dreamlover12
<< return to blog entries

Mold 33% complete!

2010-07-14 08:24:30 (6094 views)

The mold parts have been fully machined! At present the mold cavities are just missing all the fine details.

The next step is EDM (electric discharge machining). Copper electrodes and electricity are used to remove material very precisely. This is what is used to create all the fine details.

After EDM, the mold will be polished. This is another distinct process.

The mold should be finished and ready to be tested by the time we get back to China in 1 week.

We also have the DL2K-LINK overlays being produced together with the remote overlays (black color).



The final PCBs we will use for EMC testing are being created. These required adding some electrostatic discharge prevention components because part of the compliance tests involve blasting the boards with thousands of volts of static electricity. It was a simple change but we now have so many components on the remote (for battery charging and so forth) that it required some tricky hand-rerouting.

All is being set up for us to return to china, get the boards, assemble 3 samples and go to the EMC lab hopefully within 7 days. At the same time we will be experimenting with molded parts styles and colors.

Comments

By spfirefly at 2010-07-14 11:19:57 Reply
Whoa! What is the role of the USB stick? How will it work with the DL?
By traveler359 at 2010-07-14 14:05:57 Reply
on the main page look under products then look for Other Male Management Devices DL2K-LINK. It allows adjusting of the DL2k, and in time training courses for wearers of the device where good and bad performance can be controlled by the software among many other wonderful things. Least thats what I gather from that page on the website
Post new comment
(C) 2008-2016 DreamLover Laboratories - all rights reserved