2012-01-09 09:48:34 (9108 views) Our UK warehouse now has complete units ready to ship and the waiting list will be cleared within a couple of days.
Our US warehouse will still require up to 1 week before orders can be fulfilled.
Latest (and hopefully, last) mold changes for the ChronoVault are being carried out with EDM, the copper electrode should have arrived today, so in 1 week we will have the new samples and we should have units ready to ship out before Chinese new year (say, within 2 weeks if all goes smoothly)
2011-12-31 09:23:06 (12783 views) The DL Browser is being enhanced to support scripting for both the DreamLover 2000 and the ChronoVault. A new well commented Javascript class exposing all functionality as well as system querying functions is available for download here
2011-12-29 04:58:39 (10830 views) DreamLover 2000 units should be ready to ship from our UK warehouse within 5 days.
We're trying to hurry up with the US shipment too but it may take a few days longer.
ChronoVaults will still require some time - all electronic and mechanical components are ready, but we're having to make more mold modifications to the exterior in order to get the best possible result.
2011-12-21 07:07:36 (10697 views) 3 full days of FIRE at the factory and untold difficulties but the boards are ready to be sent in the next few days after another few rounds of testing.
2011-12-18 03:47:19 (11365 views) Several mold changes and 3 vendors later (the first two quit after taking a deposit because the job was too difficult), we now have an improved and strengthened ChronoVault. The top part has overmolded metallic parts.
Maximum quality and seriousness about your male's orgasm reduction, it's how we do things at DreamLover Labs.
2011-12-15 08:00:25 (11785 views) After untold problems clearing components from customs, yesterday we showed up at the factory 3 hours away only to find they had "misplaced" the stencil and that we had to come back again the next day. Today though, finally we have some great results.
This new assembly house does not have all the fancy tools the other one had, but they work HARD. There were a few critical moments that required our presence (capacitors mounted the wrong way, boards falling off the conveyor belt because no one was there to pick them up after going through the oven, one accelerometer that needed further soldering) but today we put together 5 beautiful and perfectly working ChronoVaults, 5 DreamLover 2000 receivers and 5 remote controls. We've befriended the boss and she's now personally mounting components for us and looking over a few helpers. She's very skilled and on top of things, so we'll just stay home and let them work. This assembly house has a high percentage of female workers. One of them, who is doing most of the ChronoVault work, is very cute and has beautiful slim hands capably handling our components and freshly built boards.
We should have everything finished up by Monday or Tuesday, so we'll go back to the factory to test everything, make any necessary adjustments, and hopefully ship everything to our warehouses ready for your last-minute Christmas orders!
|